-> M-53 from Red Run Drain to 18 Mile Road

This project on M-53 (Van Dyke) through Sterling Heights and Warren was 4.82 miles of road reconstruction, concrete surfacing, hot mix asphalt cold milling and resurfacing, drainage, curb, gutter, sidewalk, ramps and drive approaches, signal modernization, signing and pavement marking.