Coleman A. Young Airport


Project Highlights:

  • 25,000 tons of asphalt placed
  • GPS grade control for grading and paving
  • National Asphalt Pavement Association Award of Merit

What We Did: Coleman A. Young Airport Paving


Coleman A. Young Airport is primarily used for personal aircraft, business planes, and helicopters. The Taxiway A reconstruction project proved especially challenging because the airport had to remain open during the project to accommodate air traffic for high-profile events in Detroit, such as Monday Night Football and MLB playoff games.

We completed the project in multiple phases. The project required the most advanced GPS grade control for both grading and paving operations on the existing deep-strength asphalt taxiway (measuring between 10 and 14 inches of asphalt). Four inches of asphalt was milled off, with the remaining asphalt pulverized, reshaped, and compacted back to 100 percent density. The project involved placing 4 inches of asphalt in two lifts, totaling approximately 25,000 tons.

Ajax Is Ready to Fly

Tight timeframes. Specialized design. Demanding safety requirements. Repaving and reconstructing airport runways is one of the most challenging types of construction. Ajax Paving is one of the few contractors in the U.S. with the expertise and experience to handle these technically-sophisticated jobs.

Over the last 25 years, Ajax has placed more than 4.5 million cubic yards of concrete runways. Our expert crews, a fleet of advanced equipment, and precise concrete mix technology enable us to meet unique complexities, specifications, and qualifications required by the Federal Aviation Administration (FAA).