What We Did
This project included land balancing, underground utility work, electrical and lighting poles, sub-grade stabilization, aggregate base, and two lifts of HMA for a total of 4” of HMA, and pavement markings. We placed a total of 30,000 tons of MDOT 1100L-20AA and MDOT 1100T-20AA material. This mix has a required air void of 3.0% with a PG Grade 64-22 liquid asphalt.